Showing posts with label Bad Luck. Show all posts
Showing posts with label Bad Luck. Show all posts

Wednesday, May 21, 2008

Streak Doesn't End

Wah!!! My streak of bad luck does not end, Just a couple of minutes ago I called the batching plant to ask for the mobilization of pumpcrete here on site. Akel, their PIC told me that it is OK, the pumpcrete is operational and that it can come right away however 3 out of 4 transit mixer has broken down. What will I do? Wah!!! Anyways!!! Not so bad luck at all. I can still pour concrete on a very long interval.

Hayz...

I am Jynx

I don't know why but ever since I was assigned to handle the structural activities of our projects, a lot of misfortunes happened such as these:

  1. Formworks of Columns got broken that resulted into a lot of concrete to leak out
  2. Very heavy rains whenever I have a schedule to pour on slab
  3. Pumpcrete unavailable (break down or at neighbor project)
  4. Batching Plant broke down
  5. Generator for Bar Bender not working
  6. A lot more...including what happens in my personal life
Just yesterday another form of bad luck came upon me. This time, it was sort of combination of human failure (mine and my QC's fault) and some sort of bad luck. I will not go into details of what our faut is but had it not been resolved, the result might be catastrophic. Hahaha!!!

The bad luck is that, while having that problem that I was saying, the pumpcrete was clogged by large stones. Enough to make me too worried because....wah. Nothing!!! Its so bad...

I hope this streak of bad luck will come to an end...